Skip to main content

2025 AD to BS

2025 AD runs from 17 Poush 2081 to 16 Poush 2082 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January17 Poush 208118 Magh 2081
February19 Magh 208116 Falgun 2081
March17 Falgun 208118 Chaitra 2081
April19 Chaitra 208117 Baisakh 2082
May18 Baisakh 208217 Jestha 2082
June18 Jestha 208216 Ashadh 2082
July17 Ashadh 208215 Shrawan 2082
August16 Shrawan 208215 Bhadra 2082
September16 Bhadra 208214 Ashwin 2082
October15 Ashwin 208214 Kartik 2082
November15 Kartik 208214 Mangsir 2082
December15 Mangsir 208216 Poush 2082

For an exact day, use the AD to BS converter. Same span in BS: 2081 BS, 2082 BS