Skip to main content

2018 AD to BS

2018 AD runs from 17 Poush 2074 to 16 Poush 2075 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January17 Poush 207417 Magh 2074
February18 Magh 207416 Falgun 2074
March17 Falgun 207417 Chaitra 2074
April18 Chaitra 207417 Baisakh 2075
May18 Baisakh 207517 Jestha 2075
June18 Jestha 207516 Ashadh 2075
July17 Ashadh 207515 Shrawan 2075
August16 Shrawan 207515 Bhadra 2075
September16 Bhadra 207514 Ashwin 2075
October15 Ashwin 207514 Kartik 2075
November15 Kartik 207514 Mangsir 2075
December15 Mangsir 207516 Poush 2075

For an exact day, use the AD to BS converter. Same span in BS: 2074 BS, 2075 BS