Skip to main content

2015 AD to BS

2015 AD runs from 17 Poush 2071 to 16 Poush 2072 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January17 Poush 207117 Magh 2071
February18 Magh 207116 Falgun 2071
March17 Falgun 207117 Chaitra 2071
April18 Chaitra 207117 Baisakh 2072
May18 Baisakh 207217 Jestha 2072
June18 Jestha 207215 Ashadh 2072
July16 Ashadh 207215 Shrawan 2072
August16 Shrawan 207214 Bhadra 2072
September15 Bhadra 207213 Ashwin 2072
October14 Ashwin 207214 Kartik 2072
November15 Kartik 207214 Mangsir 2072
December15 Mangsir 207216 Poush 2072

For an exact day, use the AD to BS converter. Same span in BS: 2071 BS, 2072 BS