Skip to main content

2011 AD to BS

2011 AD runs from 17 Poush 2067 to 16 Poush 2068 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January17 Poush 206717 Magh 2067
February18 Magh 206716 Falgun 2067
March17 Falgun 206717 Chaitra 2067
April18 Chaitra 206717 Baisakh 2068
May18 Baisakh 206817 Jestha 2068
June18 Jestha 206816 Ashadh 2068
July17 Ashadh 206815 Shrawan 2068
August16 Shrawan 206814 Bhadra 2068
September15 Bhadra 206813 Ashwin 2068
October14 Ashwin 206814 Kartik 2068
November15 Kartik 206814 Mangsir 2068
December15 Mangsir 206816 Poush 2068

For an exact day, use the AD to BS converter. Same span in BS: 2067 BS, 2068 BS