Skip to main content

1978 AD to BS

1978 AD runs from 17 Poush 2034 to 16 Poush 2035 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January17 Poush 203418 Magh 2034
February19 Magh 203417 Falgun 2034
March18 Falgun 203418 Chaitra 2034
April19 Chaitra 203417 Baisakh 2035
May18 Baisakh 203518 Jestha 2035
June19 Jestha 203516 Ashadh 2035
July17 Ashadh 203516 Shrawan 2035
August17 Shrawan 203515 Bhadra 2035
September16 Bhadra 203514 Ashwin 2035
October15 Ashwin 203514 Kartik 2035
November15 Kartik 203515 Mangsir 2035
December16 Mangsir 203516 Poush 2035

For an exact day, use the AD to BS converter. Same span in BS: 2034 BS, 2035 BS