Skip to main content

1968 AD to BS

1968 AD runs from 17 Poush 2024 to 17 Poush 2025 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January17 Poush 202417 Magh 2024
February18 Magh 202417 Falgun 2024
March18 Falgun 202418 Chaitra 2024
April19 Chaitra 202418 Baisakh 2025
May19 Baisakh 202518 Jestha 2025
June19 Jestha 202517 Ashadh 2025
July18 Ashadh 202516 Shrawan 2025
August17 Shrawan 202516 Bhadra 2025
September17 Bhadra 202515 Ashwin 2025
October16 Ashwin 202515 Kartik 2025
November16 Kartik 202515 Mangsir 2025
December16 Mangsir 202517 Poush 2025

For an exact day, use the AD to BS converter. Same span in BS: 2024 BS, 2025 BS