Skip to main content

1953 AD to BS

1953 AD runs from 18 Poush 2009 to 17 Poush 2010 BS. The Nepali new year (Baisakh 1) falls in mid-April.

Month1st is (BS)Last day is (BS)
January18 Poush 200918 Magh 2009
February19 Magh 200917 Falgun 2009
March18 Falgun 200918 Chaitra 2009
April19 Chaitra 200918 Baisakh 2010
May19 Baisakh 201018 Jestha 2010
June19 Jestha 201017 Ashadh 2010
July18 Ashadh 201016 Shrawan 2010
August17 Shrawan 201015 Bhadra 2010
September16 Bhadra 201014 Ashwin 2010
October15 Ashwin 201015 Kartik 2010
November16 Kartik 201015 Mangsir 2010
December16 Mangsir 201017 Poush 2010

For an exact day, use the AD to BS converter. Same span in BS: 2009 BS, 2010 BS